Christmas Standard Delivery Deadline 12/18
: :
Get up to 50% Off! Code: MXSHIP Ends: 12/12 Details
Apply
  1. Help

Our 2006-2007 Home Remodel

Hello, you either have JavaScript turned off or an old version of Adobe's Flash Player. Get the latest Flash player.

Our 2006-2007 Home Remodel - Page Text Content

S: Our 2006-2007 Home Remodel

FC: Aug. 2006- April 2007 | Home Remodel & Extension

1: August 2006 | Our home prior to the start of our home remodel and extension project.

2: The laminate wood flooring was replaced with 16"x16"tile with 3"x3" glass tile inserts. The half-bath was remodeled with 12"x12" tile with 2"x2" glass inserts. Also 6"x6" tile was used on the wall behind the sink & toilet area.

3: Love this look!

4: D E C K | N O | M O R E

5: Finally after taking ~3 weeks to get the permits approved, the foundation wall is being done. We extended 4 feet in our kitchen and 4 feet in our master bath. | FOUNDATION WORK

6: Our kitchen prior to remodel. The cabinets were taken out & sold on CraigsList for | The return vent (shown on the bottom right photo...(under the desk) was moved during construction to the staircase wall. This wall is 7 feet wide...wait till you see what this wall is transformed into. | $1300

7: This is the temporary kitchen we set up in the Dining Room. I called it "OUR NY APT". We put this sticky plastic film down on the carpet to protect it. We used the half bath to do the dishes during construction.

8: A temp. door was put in between the entry way & FR to help with dust control. Leo and his crew worked nights & weekends. | C O N S T R U C T I O N

9: LEO & HIS CREW

10: Cabinet Install | Cabinet Install | AThe cabinets packed our garage front to back & floor to ceiling. Jeff, our cabinet installer started installing the cabinets in December & finished in January. | Going over kitchen plans with Jeff

12: KITCHEN & MASTER BATH TILING | Installed by Shawn with Todd's help | Jan. 2007

13: Family Room | Two additional windows were put in on each side o the fireplace.Todd & I installed the Hickory flooring. By March we were finished with the remodel & had full access to our home. The patio was finished in April and the house was painted in June.

14: Our gorgeous kitchen...which I

15: Our gorgeous kitchen...which I absolutely LOVE! The 7' coffee bar is my favorite. And the 6'x5' island with cook top which faces out to the FR make this such a fun place to entertain our family & friends.

16: Our Master Bath Remodel

17: STAMPED CONCRETE | By Raphel & his crew

18: We took a much needed vacation to the Mexican Rivera in May 2007. | ZIPLINE TOUR

20: Our Beautiful Home | June 2007

Sizes: mini|medium|large|huge
Sharon S
  • By: Sharon S.
  • Joined: almost 6 years ago
  • Published Mixbooks: 13
No contributors

About This Mixbook

  • Title: Our 2006-2007 Home Remodel
  • Did a 4 foot extension in our kitchen & master bath on the above floor. Remodeled our entry, half bath, kitchen, family room, & master bath.
  • Tags: None
  • Published: over 4 years ago

Get up to 50% off
Your first order

Get up to 50% off
Your first order