Enjoy up to 55% Off! Code: JOLLY Ends: 12/5 Details
Apply
  1. Help

Oyamot New Home

Hello, you either have JavaScript turned off or an old version of Adobe's Flash Player. Get the latest Flash player.

Oyamot New Home - Page Text Content

BC: Thank You

FC: Oyamot: New Home 2007

1: The Oyamot Family home was built when Pearl City still had sugarcane fields. The home had seen better days and the family wanted a modern new Ohana home big enough for the whole family. The old single wall home along with the huge mango tree in the back had to go. | Memories

6: The use of heavy equipment makes quick work of the old house and mango tree. The entire lot is cleared in two days.

8: Aggregate delivery, compaction, and trenching for footings comes next. within two weeks the house foundation is taking shape.

10: Retaining walls, form-work, and plumbing pipes are installed.

11: Vapor barrier, steel reinforcement bars, and termite treatment is applied.

12: At Pacific Style Construction we build for keeps so lots of rebar is installed and the concrete is always the strong mix. This project has a concrete foundation in just one month.

14: Framing with 2x6 allows for more insulation and a stronger structure. At Pacific Style Construction we only use brand name products like Du Pont Tyvek vapor barrier which breathes for less moisture in the house.

17: The details are what makes a long lasting structure. Note the green termite treatment at all lumber cut ends and holes. Red Iron beams allow for longer spans and less flex in the second floor.

19: At Pacific Style Construction we use thicker lumber and plywood like 1-1/8" floor sheathing and 2x6 top chords on roof trusses. All our fasteners are hot dipped galvanized and we block all of our floor joists every eight feet.

20: The Pacific Style Crew has been together for nearly a decade and it shows in the quality and durability of the homes we build. We have team spirit and pride in our work.

21: Framing of our new custom homes takes three months by four months the roof and drywall are installed. This gives us three months to install finishes for a seven month build time.

23: At pacific Style Construction we take window flashings and other waterproofing details seriously. This ensures a dry and mold free home for a lifetime.

24: The finishing is where we make the home a masterpiece and create one of a kind designs to set our work apart from our competitors. We believe a truly custom home should be affordable for everyone.

27: A beautiful exterior with outdoor living areas is a must as is durable exterior finishes which will last a lifetime.

29: Family

31: Beautiful yet inexpensive finishes are what Pacific Style Construction specializes in.

32: Travertine shower surrounds and custom paint colors for each room makes this home a showcase and a dream come true for the Oyamot Family.

Sizes: mini|medium|large|huge
Default User
  • By: May c.
  • Joined: about 5 years ago
  • Published Mixbooks: 3
No contributors

About This Mixbook

  • Title: Oyamot New Home
  • Tags: None
  • Started: over 3 years ago
  • Updated: over 3 years ago

Get up to 50% off
Your first order

Get up to 50% off
Your first order