Alaska Cabin Project

Hello, you either have JavaScript turned off or an old version of Adobe's Flash Player. Get the latest Flash player.

Alaska Cabin Project - Page Text Content

S: Staus Alaska Fishing Cabin Project

FC: Staus Family Alaska Cabin Project

1: Summer 2006 Page 02-12 Summer 2007 Page 13-18 Winter 2008 Page 19-20 Summer 2008 Page 21-28 Summer 2009 Page 29-32 Summer 2010 Page 33-37 Summer 2011 Page 38-41

2: Breaking New Ground July 2006 (4.5 weeks)

3: Although Bill wanted to excavate himself he ended up hiring Glen for the big job

4: Digging the Septic

5: Pouring the Concrete Sidewall

6: Pouring the foundation

7: Bill and Ron had one month to clear the land, pour the foundation and get the structure up and weather proofed!

8: Framing the Structure

9: Setting the Trusses

10: Building the Roof

11: Ron and Bill "borrowed" the roofer's truck to install the windows and Ron had a fit when he thought they had broke the truck!

12: The end of Alaska Summer 2006 The cabin was tucked in for a long winter's slumber

13: Summer 2007 begins by digging the well (3 weeks) | Yes those trucks are pink...!owned and operated by a bunch of hard core Alaskan ladies

14: Connecting the water lines to the well

15: Putting up the River Rock

16: Interior Construction

17: Electric | Insulation | Plumbing | Temporary Stairs

18: Don't forget time for relaxing by the fire when a hard day's work is done | And that's the end of a wonderful summer of 2007 in Alaska

19: Bill's excursion to the cabin in the Winter of 2008

21: Summer 2008 Finishing the Interor (5 weeks)

22: Painting the Interior

23: Fixtures & Tile

24: Bathrooms

25: Kitchen

26: Installing the French Drains

27: Building the Deck with Michael

28: End of Summer 2008 Deck is up and interior is finished

29: 2009 Summer Project The Spiral Staircase (2 weeks)

30: Grouting The River Rock

31: Concrete Floors Stained

32: Interior Decorating and Furnishing

33: Summer 2010 Curtains and Log Kitchen Table with Captain Chairs (3 weeks)

34: Outdoor Decorating wood carvings of bear and salmon

35: Gravel Brought in and Final Grading

36: And a Cool Custom Staus Fire Pit

37: Bought Some Zippy Four Wheelers

38: 2011 Added the Final touches (3 wks) | Finished adding the stairs and Fishing Dock

39: Updated the Fire Pit | Added River Rock to remaining wall | Jeff & Dana made Denver Broncos corn hole boards | Now organized with storage unit

40: Finished the kid's bedrooms with... | Custom Doors | Finished Trim | Real Beds too

41: Now that the work is done we can all enjoythe Alaska cabin as a family and pass it down to the future Staus generations.

Sizes: mini|medium|large|enormous
Default User
  • By: Victoria S.
  • Joined: over 5 years ago
  • Published Mixbooks: 0
No contributors

About This Mixbook

  • Title: Alaska Cabin Project
  • Theme for Mixbook Scrapbookers
  • Tags: None
  • Started: over 5 years ago
  • Updated: about 5 years ago

Get up to 50% off
Your first order

Get up to 50% off
Your first order